The suspension bridge Titan-RT and the GigaSwing at the Rappbodetalsperre
The Titan-RT spans the Bode in the middle of the Rappbode valley. The filigree rope construction was completed in 2017 and clings to the slate cliffs on both sides of the valley with an enormous tractive force of 947 tons. Four main supporting cables form the backbone of the structure. The 120 cm wide catwalk (grating) is bordered along its entire length by a 130 cm high railing and is closed at the sides by stainless steel nets.